BEED EngineeringBEED Engineering

Educational Guide

MEP Design Process for Building Owners

How MEP design typically moves from programming through construction documents and construction administration, and what owners should provide at each step.

Michael K. Frempong, PE, LEED AP

Reviewed by

Michael K. Frempong, PE, LEED AP

President & Principal Engineer, BEED Engineering

Michael K. Frempong is a professional engineer and LEED AP accredited professional with over 20 years of experience in consulting engineering. As President & Principal Engineer at BEED Engineering, he leads the firm’s MEP design and consulting work for laboratory, healthcare, industrial, data center, education, commercial, municipal, and other building projects throughout Florida.

View BEED team profile

Quick Answer

MEP design usually follows the architectural phases: programming, schematic design, design development, construction documents, permitting, and construction administration. Owners get better results by providing occupancy, existing drawings, and performance goals early. Late MEP involvement is a common cause of coordination conflicts and change orders.

The process at a glance

  1. Programming and existing-conditions review
  2. Schematic design
  3. Design development
  4. Construction documents
  5. Permitting
  6. Construction administration

This matches what an MEP engineer does.

Programming

Define occupancy, hours, special spaces, and known problems. For existing buildings, a facility assessment may come first.

Schematic design

Select system types: packaged HVAC versus chilled water, electrical service strategy, plumbing riser concept. Coordinate major shafts and equipment rooms with architecture.

Design development

Lock equipment rooms, roof layouts, and ceiling strategies. Begin load calculations and one-line diagrams.

Construction documents

Produce drawings and specifications for bidding and permit. Include control sequences and coordination notes.

Construction

Submittals, RFIs, site visits, and closeout. Optional commissioning overlaps this phase.

What owners should ask

  • What is included and excluded?
  • How many site visits?
  • Who designs fire alarm and medical gas?
  • How will existing conditions be verified?

Related: How much does MEP engineering cost? and the hiring checklist.

BEED has carried that process through design and construction administration on projects such as Route 1 Motorsport, Florida Tech fume hood modernization, and Apollo Surgery Center.

Common Questions

Can MEP skip schematic design?

Small replacements sometimes can. New buildings and complex renovations should not. Early system decisions are cheaper than late redraws.

What does the owner need to provide?

Program, existing drawings if any, utility information, and a clear statement of performance goals and budget constraints.

Filed under Construction & Design

Continue exploring

Related Questions

Related BEED Services

Related Locations

Local Presence

BEED Engineering — Based in Palm Bay, Serving Florida

BEED Engineering is an MBE professional consulting engineering firm based in Palm Bay, Florida, providing mechanical, electrical, plumbing (MEP) design and consulting engineering services for commercial, institutional, healthcare, laboratory, industrial, and other facilities throughout Florida. BEED Engineering is a firm you can trust to get the job done.

Need Engineering Help?

Starting a building project and need MEP on the team?

BEED Engineering can join at programming or schematic design and carry mechanical, electrical, and plumbing through construction.